Projects from the last ten years

پروژه ها Projects from the last ten years

Manufacturing, Transportation, and Installation of Steel Structures for Three Preheating Furnaces with a Capacity of 240 Tons per Hour

Avatar for kaviradminKaviradminDecember 9, 2024
Scope of Work: Design and engineering for the refurbishment of Furnaces 3 and 4 of the Hot Rolling Mill. Procurement and ...اطلاعات بیشتر

Construction of Calcined Lime / Dolomite Production Plants with a Capacity of 800 Tons per Day and Micronized Bentonite Powder with a Capacity of 70,000 Tons per Year

Avatar for kaviradminKaviradminDecember 9, 2024
Scope of Work: Design, procurement, and execution of civil works, construction, electrical, and mechanical installations. Installation, commissioning, and operation of production ...اطلاعات بیشتر

Repair and Reinforcement Operations for the Movable Structure of Walking Beam Furnaces 3 and 4 in the Hot Rolling Mill

Avatar for kaviradminKaviradminJanuary 11, 2025
Scope of Work: Design and engineering for the refurbishment of Preheating Furnaces 3 and 4 in the Hot Rolling Mill. Procurement ...اطلاعات بیشتر

Installation of Equipment, Testing, Commissioning, and Execution Operations for the Refurbishment Project of Walking Beam Furnaces No. 3 and 4

Avatar for kaviradminKaviradminDecember 9, 2024
Scope of Work: Design and engineering for the refurbishment of Walking Beam Furnaces 3 and 4 in the Hot Rolling Mill ...اطلاعات بیشتر

Repair of Preheating Furnace Equipment in Hot Rolling Mill

Avatar for kaviradminKaviradminDecember 9, 2024
Objectives: Refurbishment of Walking Beam Furnace No. 3, including replacement of the movable frame based on foreign technology designs and replacement/repair ...اطلاعات بیشتر

Replacement, Modification, Repair, and Reinforcement of the Steel Structure of the Preheating Warehouse Hall in the Hot Rolling Mill (Unit 51)

Avatar for kaviradminKaviradminDecember 9, 2024
Scope of Work: Demolition and drilling of concrete foundations, rebar anchoring in existing foundations, and execution of foundation modification plans. Procurement, ...اطلاعات بیشتر

Cutting and Preparation of Light and Heavy Scrap, Scarfing, and Slab Skinning in the Steelmaking and Continuous Casting Areas of Mobarakeh Steel Company

Avatar for kaviradminKaviradminDecember 9, 2024
Scope of Services: Cutting and preparation of: 70,000 tons of scrap annually in the steelmaking area. 18,000 tons of light scrap ...اطلاعات بیشتر

Design, Transportation, and Installation of 4000 Saddles at the Export Site of Mobarakeh Steel Company in Bandar Abbas

Avatar for kaviradminKaviradminDecember 9, 2024
Scope of Work: Comprehensive design and engineering services for the project. Preparation of detailed execution drawings. Fabrication and construction of 4,000 ...اطلاعات بیشتر

Design, Engineering, Procurement, Manufacturing, Transportation, Installation, Testing, Commissioning, and Training for the Boom Reclaimer

Avatar for kaviradminKaviradminDecember 9, 2024
Scope of Work: Comprehensive design and engineering for the project. Procurement and provision of all required complementary equipment and components. Fabrication, ...اطلاعات بیشتر

Design and Construction of Equipment, Complete Installation, and Commissioning of Imported STRIPPER CAR for Hot Rolling

Avatar for kaviradminKaviradminJanuary 7, 2025
cope of Work: Design and engineering for the project. Procurement of materials and components required for the STRIPPER CAR system. Fabrication ...اطلاعات بیشتر

Posts pagination

1 2

درباره ی ما

  • Articles of Association
  • Certificates
  • Capabilities

لینک های مهم

  • Steel newsletter
  • Recent projects
 

Contact Us

  • WhatsApp call
  • Contact Us
© کپی رایت 2026 شرکت تجهیزات پولاد کویر.