Replacement, Modification, Repair, and Reinforcement of the Steel Structure of the Preheating Warehouse Hall in the Hot Rolling Mill (Unit 51)

About the Project

Objectives: Replacement of the crane girders and strengthening of the steel structure of the Hot Rolling Slab Storage Building.

Project Information

Project Name: Replacement, Modification, Repair, and Strengthening of the Steel Structure of the Hot Rolling Reheating Slab Storage Building (Unit 51)

Client: Mobarakeh Steel Company

Contract Type: EPC

Commissioning Year: 2019

Project Details

Demolition and drilling of the concrete foundations; installation of reinforcing bars into the existing foundations; execution of the foundation modification plan; procurement and supply of materials; fabrication, sandblasting, and painting of the steel structure of the industrial shed, handrails, crane girders, walkways, longitudinal trusses, and related steel components; supply and installation of supports for process piping and cable trays; relocation of electrical, drainage, and utility services; execution of piping works; electrical power supply to the equipment; supply and installation of crane rails and conductor rails, including relocation of the paging system; and strengthening of the existing columns and crane girders.