




Objectives: Design, transportation, and fabrication of 4,000 coil storage saddles for the export site in Bandar Abbas.
Project Name: Design, Execution, Preparation of Construction Drawings, Transportation, and Installation of 4,000 Coil Storage Saddles at the Export Site of Mobarakeh Steel Company in Bandar Abbas in Accordance with International Standards
Client: Mobarakeh Steel Company
Contract Type: EPC
Commissioning Year: 2016
Location: Mobarakeh Steel Complex





Design, execution, preparation of construction drawings, transportation, and installation of 4,000 coil storage saddles at the export site of Mobarakeh Steel Company located in Bandar Abbas, in accordance with international standards.




