Objectives: Reconstruction of Walking Beam Furnace No. 3 (replacement of the movable frame based on the foreign technology design, as well as replacement and refurbishment of the fixed frame of Reheating Furnaces No. 3 and No. 4 of the Hot Rolling Mill).
Project Name: Maintenance of Reheating Furnace Equipment at the Hot Rolling Mill
Client: Mobarakeh Steel Company
Contract Type: EPC
Commissioning Year: 2020
Location: Mobarakeh Steel Complex





Maintenance of the furnaces in the Hot Rolling Mill, including the replacement, modification, optimization, and servicing of equipment and components in the reheating furnaces in accordance with the attached list; removal and transportation of oxide scales from inside the furnaces; and industrial cleaning of the reheating furnace section.