Englishفارسی
[email protected]
03137788804
شرکت تجهیزات پولاد کویر
  • Home
  • About Us
  • Projects
    • Ongoing Projects
    • Projects of the Last Ten Years
  • Contact Us
  • Resume
#En#Fa
شرکت تجهیزات پولاد کویر
  • Home
  • About Us
  • Projects
    • Ongoing Projects
    • Projects of the Last Ten Years
  • Contact Us
  • Resume

Ongoing projects

پروژه ها Ongoing projects

Increasing the capacity of the tundish and tundish machines at Mobarakeh Steel’s casting plant from 40 tons to 60 tons

Avatar for kaviradminKaviradminDecember 2, 2024
Providing all design and engineering services in the civil, mechanical and hydraulic, electrical, and automation sectors using foreign technology; procurement and ...اطلاعات بیشتر

Redesign and Engineering, Procurement of Main Components for Cardumper1

Avatar for soheilSoheilJanuary 4, 2023
cope of Work: The scope of contract No. 48535115 includes: Redesign, engineering, procurement, manufacturing, installation, testing, and commissioning of core components ...اطلاعات بیشتر

Construction, Transportation, and Installation of Steel Structures for Three Preheating Furnaces with a Capacity of 340 Tons per Hour

Avatar for kaviradminKaviradminDecember 9, 2024
Scope of Work: Development of a 3D model of drawings and documents for the steel structures. Fabrication of furnace steel structures ...اطلاعات بیشتر

درباره ی ما

  • Articles of Association
  • Certificates
  • Capabilities

لینک های مهم

  • Steel newsletter
  • Recent projects
 

Contact Us

  • WhatsApp call
  • Contact Us
© کپی رایت 2026 شرکت تجهیزات پولاد کویر.